You are here

BARC Monthly Ride - Alameda Creek Trail

Contact:

Meet at the Niles Staging Area parking lot, 720 Old Canyon Road Fremont, CA.

Ride Description: The Alameda Creek Trail is a flat, paved trail that runs along Alameda Creek out to Coyote Hills/San Francisco Bay.

Optional 3.5 mile loop at Coyote Hills with nice view of the bay and some hills. 

Distance: ~18 miles round trip, ~21.5 with optional loop.

Pace: ~10 mph

Additional Alameda Creek Trail info, including trail map: http://www.ebparks.org/Page159.aspx

Optional additional miles after the Alameda Creek Trail for any one interested: Mission Blvd. / Paseo Padre loop?

24 Jun 2017 - 9:30am
, 720 Old Canyon Road, Fremont, CA, 94536

This just in

In an unconventional move, Azub is raising prices in mid-season.

On Monday 15 May 2017, Azub prices will increase by 2-5%. 

13 May 2017 - 3:12pm

Recumbent Tandem Rider (RTR) Magazine has been covering the recumbent industry these last many years since the beginning -- and now, for the first time, the print copy of RTR magazine is available online.

27 Apr 2017 - 8:18am

[Disclaimer: This item was posted on April Fools Day, 2017. It is not to be taken seriously, though, perhaps, half-seriously. The rack and the trike are real and not Photoshopped. The trike is a Terratrike (perhaps an older Tour) and the rack is based on HP Velotechnik design.]

1 Apr 2017 - 8:16am

Catrike has resolved its production issues for the eon-green color and is now producing recumbent trikes in this color again.

27 Mar 2017 - 10:09am

Pages

Upcoming

25 Jun 2017 - 8:15am

Meetup: 8:15 am; Rollout: 8:30 am Ride Summary: Ride from the Fish Hatchery to Hoppy Brewing Company for brunch and back *(cash preferred).

Read more...